Studwelders Composite Floor Decks Ltd installed 4,145m2 of MetFloor 80 steel decking, and FibreDeck concrete at the new Premier Inn in Portsmouth. The £8.8M, 120-bed hotel has an iconic curved design and is situated very close to the Portsmouth Historic Dockyard and Portsmouth Harbour railway station.
View ProjectStudwelders Composite Floor Decks installed approximately 100m2 of MetFloor 60 decking to the new Sands of Speed Museum in Pendine, Carmarthenshire, where numerous land speed records have been broken.
View ProjectDuring the refurbishment of the historic Bodmin Jail in Cornwall, Studwelders Composite Floor Decks supplied and fitted over 250m2 of MetFloor 55 steel decking to the brand-new ‘Dark Walk’ attraction.
View ProjectStudwelders Composite Floor Decks have been selected to supply over 5000m2 of MetFloor 55 steel decking to the IAAPS facility in the Bristol and Bath Science Park.
View ProjectStudwelders Composite Floor Decks Ltd supplied and installed almost 9000m2 of MetFloor 60 steel decking to Access Group’s new £22M HQ in Loughborough University Science Park.
View ProjectStudwelders Composite Floor Decks successfully installed almost 100 square metres of MetFloor 60 and over 650 square metres of MetFloor 80 steel decking to the Hall for Cornwall redevelopment. SCFD also carried out the concreting works to produce a composite flooring system in Cornwall’s premier theatre, which dates back to 1846.
View ProjectStudwelders Composite Floor Decks Ltd have installed over 6000 square metres of MetFloor 55 and almost 11,000 square metres of MetFloor 60 steel decking to Phase 2 of the New Era Square development in Sheffield.
View ProjectStudwelders Composite Floor Decks were selected to supply and install over 4000 square metres of MetFloor 60 steel decking to the first ancilliary buildings at Hinkley Point C. The decking, as well as shear studs were installed in the first permanent onsite buildings, the Simulator Training Centre and the HHA Warehouse in early 2019.
View ProjectStudwelders Composite Floor Decks was entrusted with the installation of approximately 28,000 square metres of MetFloor 55 steel decking to 6 Central Square, Cardiff. During the installation, Studwelders also welded thousands of steel shear studs and fitted steel edge trim and safety netting to the structure.
View ProjectStudwelders Composite Floor Decks were chosen to deliver and fit over 9000 square metres of traditional MetFloor 55 steel decking to Romo Group’s new headquarters near Mansfield. Romo Group is a Nottinghamshire-based luxury fabrics designer and manufacturer, and their new 33,000 square metre HQ will consolidate their business operations onto a single site.
View ProjectStudwelders Composite Floor Decks won the contract to supply over 5000m2 of MetFloor 60 steel decking to the Engineering North building on Swansea University’s Bay Campus.
View ProjectStudwelders Composite Floor Decks was contracted to supply and install over 5,500 square metres of MetFloor 60 steel decking, and provide the concreting services on the new Torfaen Learning Zone.
View ProjectStudwelders Composite Floor Decks was appointed to install 1050m2 of crushed end Metfloor 80 and carry out concreting works on the Marine Centre of Excellence, Saundersfoot.
View ProjectStudwelders Composite Floor Decks were selected to supply and install over 8000 square metres of long-span MetFloor 60 steel decking and carry out the concreting on the Cardiff Bay Premier Inn. The £15M 210-bed hotel features an iconic design, occupying a prime location on the Cardiff waterfront, and will be the chain’s largest hotel when it opens in September 2019.
View ProjectFollowing their previous co-operation, Bouygues UK contracted Studwelders Composite Floor Decks to supply and install MetFloor steel decking to the new ‘super-schools’ Ysgol Cwm Brombil and Ysgol Bro Dur.
View ProjectStudwelders Composite Floor Decks was contracted during the redevelopment of the 55 Moorgate office block, to supply and install almost 5000 square metres of MetFloor 60 steel decking.
View ProjectStudwelders Composite Floor Decks supplied and installed over 8000m2 of MetFloor 55, almost 9000m2 of MetFloor 60 and almost 6000m2 of MetFloor 80 steel decking to the ICC Wales development in the Celtic Manor Resort.
View ProjectStudwelders Composite Floor Decks installed almost 10500 square metres of MetFloor 60 and almost 3500 square metres of MetFloor 80 steel decking and all the concreting works on The Metalworks luxury apartment developments in Slough.
View ProjectStudwelders Composite Floor Decks was awarded the contract to supply and install over 11,000 square metres of MetFloor 55 steel decking, and pour concrete to create composite floor decks in 3 buildings in the Taff Vale redevelopment in Pontypridd.
View ProjectStudwelders Composite Floor Decks installed almost 700 square metres of MetFloor 80 steel decking and poured tons of concrete to create a composite deck system in Custom House station, in south-east London, as part of the development of the Elizabeth line.
View ProjectStudwelders Composite Floor Decks were appointed to install steel decking, steel shear studs, safety netting and concrete to the Royal Navy’s new HMS Cambria HQ in Cardiff Bay.
View ProjectStudwelders Composite Floor Decks was awarded the contract the supply over 1000 square metres of MetFloor 60 decking to the University of Wolverhampton’s School Of Architecture and the Built Environment (SOABE) on the new Springfield Campus site.
View ProjectComposite Metal Flooring manufactured 13,000m2 of MetFloor 55 steel decking for use in the regeneration and extension of the 1972 King’s Reach Tower.
View ProjectComposite Metal Flooring manufactured nearly 100,000m2 of MetFloor 55 and MetFloor 80 in what was then their 2ndlargest ever contract – The Broadway shopping complex in Bradford.
View ProjectComposite Metal Flooring manufactured 28,000m2 of MetFloor 55 steel decking for One New Street Square, Deloitte’s future HQ in the City of London.
View ProjectComposite Metal Flooring manufactured over 8000 m2 of MetFloor 55 and MetFloor 60 steel decking for the extension to the Oriana project on Oxford Street.
View ProjectComposite Metal Flooring manufactured over 38,000m2of MetFloor 55, MetFloor 60 and MetFloor 80 for use in Bracknell’s re-generation and re-development of the town centre.
View ProjectComposite Metal Flooring manufactured 6,356m2 of MetFloor 60 steel decking for use in the construction of the new “super-school” for 1500 pupils in Sandfields, Port Talbot, West Glamorgan.
View ProjectComposite Metal Flooring supplied 30,560 square metres of steel decking to the re-development of the 1979 One Angel Court, situated in the City of London, to modernise and extend the tower.
Composite Metal Flooring manufactured 11,448 square metres of Metfloor 60 steel decking for use in the construction of the office building, topped by six tiered roof gardens.
View ProjectComposite Metal Flooring manufactured 4343 square meters of Metfloor 55 to construct 5 storeys of the new Atrium 2B extension in the University of South Wales.
View ProjectComposite Metal Flooring recieved their 2nd largest contract to date, when commissioned to supply Metfloor steel decking to the 68,750 square metre extension to what will become the UK’s largest shopping centre.
View ProjectComposite Metal Flooring was contracted to manufacture nearly 16,000m2 of MetFloor 55 and MetFloor 60 steel decking for BBC Wales’ new state-of-the-art HQ in Cardiff.
View ProjectComposite Metal Flooring are manufacturing 20,600m2 of MetFloor 60 steel decking for use in the redevelopment of White Hart Lane, the Tottenham Hotspurs’ Stadium.
View ProjectComposite Floor Decks group supplied and installed nearly 160,000m2 of Metfloor 55 to 22 Bishopsgate in the City of London, the largest project for the group this decade.
View ProjectA New Neighbourhood – Now Launched
From penthouses and warehouse-style apartments with a distinctively London edge, to studios and flats with one to four bedrooms, these are homes with character. A cultural quarter for retail with taste
View ProjectProposals to redevelop the Warwick Quadrant in Redhill were announced on the 6th June by Sainsbury’s, Aviva Investment, and Reigate and Banstead Borough Council. If accepted it will be a major development in the Council’s “commitment to the revitalisation of the town centre”.
View ProjectConstruction officially underway on Aberdare’s new £22m Coleg y Cymoedd campus, First Minister Carwyn Jones broke the ground on-site in Robertstown on Wednesday morning, 18 months before it is due to open.
View ProjectComposite Metal Flooring manufactured the Metfloor 60 decking used in the construction of four storeys of the landmark Royal Pavilion, Poundbury in 2015.
View ProjectComposite Metal Flooring supplied over 150,000m2 of MetFloor 60 to Amazon’s 13th warehouse in the UK from October 2016 to March 2017.
View ProjectComposite Floor Decks manufactured and installed nearly 7,500m2 of MetFloor 80 steel decking on No 1 Court, Wimbledon, during its refurbishment.
View ProjectWork has begun on a £121m Defence College of Technical Training at the former RAF Lyneham airbase. It will provide training facilities for the three armed services at the base in Wiltshire which closed in 2012.
View ProjectA new 120 bed hotel at Pacific Quay by De Vere Village Urban Resorts will provide accommodation to support The Hydro Arena and will be an important step in redeveloping the former Glasgow Garden Festival site.
View ProjectUP TO 100 new jobs are set to be created at Harwell thanks to a major investment in a new telecoms satellite monitoring headquarters for the whole of Europe.
View ProjectPortsmouth is now home to the Ben Ainslie Racing America’s Cup sailing team after they were granted funding from the government and planning approval from the council.
View ProjectCONTRACTORS have been appointed for the next £27m phase of the Brewery Square development in Dorchester.
View ProjectMore than 10,000t of structural steelwork will eventually be erected for the Trinity Square development in Gateshead, creating a regenerated town centre on the south bank of the River Tyne.
View ProjectWestfields Olympic Gateway, located next to London’s Olympic Park, Europe’s largest urban shopping centre is rapidly taking shape.
Martin Cooper reports from a project which will act as a gateway to the 2012 Games.
Studwelders Composite Floor Decks Ltd
Millennium House,
Severnlink Distribution Centre, Newhouse Farm Industrial Estate,
Mathern, Chepstow, Monmouthshire,
NP16 6UN
South Wales
UK