Studwelders Composite Floor Decks install in the region of 200,000m2 of concrete per annum and are member of The Concrete Society
Advantages and Service
To compliment our floor decking products we also offer a complete floor slab construction by adding the supply and laying of reinforced concrete.
We offer a dedicated concrete placement service managed by our in-house concrete managers, all our concrete projects are planned with the same detail as our decking projects to minimize any delays to the project programme therefore receiving the concrete immediately after the decking and welding operations are completed.
This single point solution allows integrated deck slab design with associated trade interface and programme advantages.
We offer concrete topping to both the suspended floor slab and also ground floor slabs using both mesh fabric and loose bar or fibre reinforcement.
We have installation teams positioned throughout the UK therefore eliminating travel and environmental issues.