Studwelders logo
Estimating & general enquiries: 01291 626048
Estimating & general enquiries 01291 626048
Construction Metal Forming - about us

Welcome to Studwelders® Projects

Southbank Tower, Bankside, Southwark

Composite Metal Flooring manufactured 13,000m2 of MetFloor 55 steel decking for use in the regeneration and extension of the 1972 King’s Reach Tower.

View Project
The Broadway, Bradford

Composite Metal Flooring manufactured nearly 100,000m2 of MetFloor 55 and MetFloor 80 in what was then their 2ndlargest ever contract – The Broadway shopping complex in Bradford.

View Project
1 New Street Square, City of London

Composite Metal Flooring manufactured 28,000m2 of MetFloor 55 steel decking for One New Street Square, Deloitte’s future HQ in the City of London.

View Project
Oriana 2, Oxford Street, Soho

Composite Metal Flooring manufactured over 8000 m2 of MetFloor 55 and MetFloor 60 steel decking for the extension to the Oriana project on Oxford Street.

View Project
Bracknell Town Centre, Berkshire

Composite Metal Flooring manufactured over 38,000m2of MetFloor 55, MetFloor 60 and MetFloor 80 for use in Bracknell’s re-generation and re-development of the town centre.

View Project
Ysgol Bae Baglan, Port Talbot, West Glamorgan

Composite Metal Flooring manufactured 6,356m2 of MetFloor 60 steel decking for use in the construction of the new “super-school” for 1500 pupils in Sandfields, Port Talbot, West Glamorgan.

View Project
One Angel Court, Bank, London

Composite Metal Flooring supplied 30,560 square metres of steel decking to the re-development of the 1979 One Angel Court, situated in the City of London, to modernise and extend the tower.

Studwelders Ltd carried out the installation of over 30,000 square metres of MetFloor 55, MetFloor 60 and MetFloor 80 steel decking to the tower, over a 12 month period, starting in July 2015.

View Project
Verde Building, SW1, Victoria, Westminster

Composite Metal Flooring manufactured 11,448 square metres of Metfloor 60 steel decking for use in the construction of the office building, topped by six tiered roof gardens.

View Project
Atrium 2B, University of South Wales, Cardiff

Composite Metal Flooring manufactured 4343 square meters of Metfloor 55 to construct 5 storeys of the new Atrium 2B extension in the University of South Wales.

View Project
Westfield London Phase 2, White City, London

Composite Metal Flooring recieved their 2nd largest contract to date, when commissioned to supply Metfloor steel decking to the 68,750 square metre extension to what will become the UK’s largest shopping centre.

View Project
BBC Wales HQ, Cardiff

Composite Metal Flooring was contracted to manufacture nearly 16,000m2 of MetFloor 55 and MetFloor 60 steel decking for BBC Wales’ new state-of-the-art HQ in Cardiff.

View Project
White Hart Lane

Composite Metal Flooring are manufacturing 20,600m2 of MetFloor 60 steel decking for use in the redevelopment of White Hart Lane, the Tottenham Hotspurs’ Stadium.

View Project
22 Bishopsgate, City of London

Set to be completed in 2019, 22 Bishopsgate will become the 2nd tallest building in the United Kingdom, at 278m, behind only The Shard.

View Project
ISLINGTON SQUARE, LONDON

A New Neighbourhood – Now Launched

From penthouses and warehouse-style apartments with a distinctively London edge, to studios and flats with one to four bedrooms, these are homes with character. A cultural quarter for retail with taste

View Project
WARWICK QUADRANT, REDHILL

Proposals to redevelop the Warwick Quadrant in Redhill were announced on the 6th June by Sainsbury’s, Aviva Investment, and Reigate and Banstead Borough Council. If accepted it will be a major development in the Council’s “commitment to the revitalisation of the town centre”.

View Project
ABERDARE CAMPUS, ABERDARE

Construction officially underway on Aberdare’s new £22m Coleg y Cymoedd campus, First Minister Carwyn Jones broke the ground on-site in Robertstown on Wednesday morning, 18 months before it is due to open.

View Project
Royal Pavilion, Poundbury

Composite Metal Flooring manufactured the Metfloor 60 decking used in the construction of four storeys of the landmark Royal Pavilion, Poundbury in 2015.

View Project
Amazon, Tilbury, Essex

Composite Metal Flooring supplied over 150,000m2 of MetFloor 60 to Amazon’s 13th warehouse in the UK from October 2016 to March 2017.

View Project
No 1 Court, Wimbledon

Composite Floor Decks manufactured and installed nearly 7,500m2 of MetFloor 80 steel decking on No 1 Court, Wimbledon, during its refurbishment.

View Project
RAF Lyneham Airbase

Work has begun on a £121m Defence College of Technical Training at the former RAF Lyneham airbase. It will provide training facilities for the three armed services at the base in Wiltshire which closed in 2012.

View Project
De Vere Village Urban Resort

A new 120 bed hotel at Pacific Quay by De Vere Village Urban Resorts will provide accommodation to support The Hydro Arena and will be an important step in redeveloping the former Glasgow Garden Festival site.

View Project
RAL 100, Research Facility , Oxford

UP TO 100 new jobs are set to be created at Harwell thanks to a major investment in a new telecoms satellite monitoring headquarters for the whole of Europe.

View Project
Ben Ainslie Racing (BAR) – Portsmouth

Portsmouth is now home to the Ben Ainslie Racing America’s Cup sailing team after they were granted funding from the government and planning approval from the council.

View Project
Brewery Square, Dorchester

CONTRACTORS have been appointed for the next £27m phase of the Brewery Square development in Dorchester.

View Project
Trinity Square, Gateshead

More than 10,000t of structural steelwork will eventually be erected for the Trinity Square development in Gateshead, creating a regenerated town centre on the south bank of the River Tyne.

View Project
Best practice with steel

Work to build a new centrally located  healthcare facility in Frome, Somerset is progressing on schedule and relying on steel construction to achieve its aspirations.

View Project
Steel wins carbon comparison

The latest in the Cost Comparison Study series, which has just been published, shows once again that steel remains the most cost effective way to build modern offices, as well as being increasingly obviously the superior option when sustainability is important – which is of course always.

View Project
Kings Avenue Mall, Cyprus – 103,000m2

The Kings Avenue Mall is the new, full concept, under development shopping mall of Paphos. This state of the art commercial building is developed by a joint venture, Athiari Commercial Ltd (Paphos) and is one of the largest commercial developments on the island of Cyprus. The total investment will exceed the amount of €100 million and will serve as the ultimate shopping experience.

View Project
Studwelders Composite Floor Decks Ltd wins Specialists award

Studwelders Composite Floor Decks Ltd picked up the prize for Steelwork at the Specialists Awards, held at the Hilton Hotel, London.

View Project
Royal opening for Media City

Her Majesty the Queen has completed the official opening of the Media City UK complex in Salford, a project which required more than 8,000t of structural steelwork during its construction phase.

View Project
CMF Opens New Factory

CMF’s new production facility based in Mamhilad, Monmouthshire was officially opened by Matthew Smith and Stephen Haines on Friday 26th September 2008.  The factory houses three dedicated profile production lines with a capability of 24 hour continuous roll forming.

View Project
CMF launches state of the art Design Software

To coincide with the launch of the MetFloor profiles CMF has published its floor decking design software.

View Project
CMF partners with local Haulage Company

CMF has agreed a partnering arrangement with local Haulage Company Gerry Jones Ltd to transport its entire product range throughout the UK.

View Project
Westfields Olympic Gateway

Westfields Olympic Gateway, located next to London’s Olympic Park, Europe’s largest urban shopping centre is rapidly taking shape.
Martin Cooper reports from a project which will act as a gateway to the 2012 Games.

View Project

Contact Us

Estimating & General Enquiries

01291 626048

Email  

Studwelders Composite Floor Decks Ltd

Millennium House,
Severnlink Distribution Centre, Newhouse Farm Industrial Estate,
Mathern, Chepstow, Monmouthshire,
NP16 6UN
South Wales UK

Company logo Company logo Company logo
Part of the Composite Floor Deck Group of companies
Composite Floor Deck Group
© 2019, Studwelders Composite Floor Decks Ltd All rights reserved. Website by Plum Design.